William Mitchell William Mitchell
0 Course Enrolled • 0 Course CompletedBiography
Free PDF Quiz PRINCE2-Agile-Practitioner - PRINCE2 Agile Practitioner Project Management Exam Accurate Valid Test Duration
If you are still afraid of trying our PRINCE2-Agile-Practitioner exam quiz, you will never have a chance to grow. Opportunities are always for those who prepare themselves well. The only way to harvest wealth is challenging all the time. Our PRINCE2-Agile-Practitioner practice materials are waiting for you. Cheer up for yourself. There is nothing that you will lose for our demos of the PRINCE2-Agile-Practitioner study materials are totally free to download.
PRINCE2 PRINCE2-Agile-Practitioner Exam Syllabus Topics:
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
Topic 5 |
|
>> Valid PRINCE2-Agile-Practitioner Test Duration <<
Reliable and Guarantee Refund of PRINCE2 PRINCE2-Agile-Practitioner Exam Dumps According to Terms and Conditions
You may urgently need to attend PRINCE2-Agile-Practitioner certificate exam and get the certificate to prove you are qualified for the job in some area. But why PRINCE2-Agile-Practitioner certificate is valuable and useful and can help you a lot? Because passing the test certification can help you prove that you are competent in some area and if you buy our PRINCE2-Agile-Practitioner Study Materials you will pass the test almost without any problems. We are professional in these career for more than ten years and can give you promised success.
PRINCE2 Agile Practitioner Project Management Exam Sample Questions (Q31-Q36):
NEW QUESTION # 31
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Event Village - Additional information
The aim of the event village is to provide a range of services and activities for anyone attending the football tournament.
The event village will comprise a number of work packages:
1. Event village design
2. A 'kids-zone' which includes trampolines and swings, as well as the opportunity to try out other sporting activities
3. Stalls which will be sold to local businesses to raise funds for the event:
Refreshment stalls within a large food tent. The LGA is keen to promote the culinary diversity of the town whilst adhering to the objective of eating healthily.
There are 30 vendor stalls selling products related to the event.
The LGA has five stalls to promote their longer term aims and to demonstrate current and future initiatives.
4. A car park for 200 cars.
5. Temporary facilities including changing rooms, toilets and shower facilities.
6. Dismantling of the event village and clean up.
The Event Village Team is assembled using staff from various LGA departments who have no experience of working with agile.
Using the Project Scenario and Event Village Additional information, answer the following question:
The Event Village Team is holding a workshop to decide how to meet the varied and often conflicting requirements for culturally diverse, healthy and quick food because several days have already been spent trying to establish the way forward. The workshop involves only the Event Village Team without the use of an independent facilitator.
Which reason BEST explains why this workshop is a good application of the 'rich communication' focus area?
- A. A workshop enables problems to be solved quickly.
- B. A workshop is run informally to enable effective face-to-face communication.
- C. A workshop can help improve team dynamics and bonding.
- D. A workshop will use fewer resources to resolve problems.
Answer: B
Explanation:
Workshops facilitate direct, face-to-face interaction among team members, allowing for richer communication. This informal setting encourages open dialogue, brainstorming, and collaborative problem- solving, which are essential for addressing complex and conflicting requirements effectively.
NEW QUESTION # 32
Which is a benefit that can be realized by a PRINCE2 organization seeking to adopt PRINCE2 Agile?
- A. Reduced number of roles by combining project manager with team manager.
- B. Comprehensive documentation is reduced as working software is a priority.
- C. Lower cost of ownership throughout the life of the project's delivered product(s).
- D. Improved maintenance of a business case throughout the project
Answer: B
Explanation:
This benefit reflects the Agile principle of prioritizing working software over extensive documentation, which can lead to more efficient project delivery.
NEW QUESTION # 33
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out';
the training of LGA staff as volunteers to run and support the event;
back-office processes to handle the applications;
fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Event Village - Additional information
The aim of the event village is to provide a range of services and activities for anyone attending the football tournament.
The event village will comprise a number of work packages:
1. Event village design
2. A 'kids-zone' which includes trampolines and swings, as well as the opportunity to try out other sporting activities
3. Stalls which will be sold to local businesses to raise funds for the event:
Refreshment stalls within a large food tent. The LGA is keen to promote the culinary diversity of the town whilst adhering to the objective of eating healthily.
There are 30 vendor stalls selling products related to the event.
The LGA has five stalls to promote their longer term aims and to demonstrate current and future initiatives.
4. A car park for 200 cars.
5. Temporary facilities including changing rooms, toilets and shower facilities.
6. Dismantling of the event village and clean up.
The Event Village Team is assembled using staff from various LGA departments who have no experience of working with agile.
Using the Project Scenario and Event Village Additional information, answer the following question:
As a: Footballer participating in the event
I want to: Have a private cubicle to change in before my football match, without having to wait for more than
5 minutes
So that: I can be ready for the game
Which statement explains whether the 'function' in this user story is appropriate?
- A. The function is poor because it contains a performance element that is better suited to a technical story.
- B. The function is poor because it does NOT contain any prioritization of the requirement.
- C. The function is good because it contains a time element that can be measured.
- D. The function is good because it contains a solution for the requirement.
Answer: A
Explanation:
While the user story describes the desired functionality of having a private cubicle, the inclusion of a specific performance element (waiting time of no more than 5 minutes) is more aligned with non-functional requirements, which are typically documented as technical stories. This could lead to confusion about the primary function being requested, as it mixes functional and performance criteria.
NEW QUESTION # 34
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications;
an event village to support the 'family day out';
the training of LGA staff as volunteers to run and support the event;
back-office processes to handle the applications;
fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Website - Additional information
A new website will be built for the event. There are five work packages within this product:
1. Initial homepage:
Website showing the event details, competition rules, etc.
2. Team Registration functionality:
team name, player's names and ages;
contact information;
payment;
lunch pack requirements (includes any special dietary needs);
car parking requirements.
3. Social media promoting the event and its aims.
4. Applications (apps) to promote healthy lifestyles including fitness and healthy eating apps.
5. Health Park:
An online knowledge base about healthy lifestyles that includes a discussion forum.
The Website Team have a lot of experience in IT and have been using agile for several years. They are delivering the website through five two-week timeboxes. The team uses a Scrum Master to facilitate and the Scrum process and coach people accordingly.
The Website Team are very good at Scrum. They have created a set of tasks to assess more difficult work and they refer to this as sprint zero.
Using the Project Scenario and Website Additional information, answer the following question:
The Scrum Master has been advised by the supplier subject matter expert that the five day task of building the social media website is now almost complete - there is just one more day's work to do.
How should this be shown on the burn-down chart?
- A. The task should be shown as 80% complete as there is only one day's worth of effort left.
- B. The task should be marked as almost complete as there is less than one day's worth of effort left.
- C. The work remaining should be the difference between work completed and work left to be done.
- D. The task should NOT be updated until the task has been completed.
Answer: A
Explanation:
The burn-down chart should reflect the current status of work remaining accurately. Since there is less than one day's worth of work left, marking the task as almost complete provides a clearer picture of progress and helps the team understand how much effort is needed to finish the task. This approach promotes transparency and effective tracking of progress.
NEW QUESTION # 35
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre oftown has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Website - Additional information
A new website will be built for the event. There are five work packages within this product:
1. Initial homepage:
Website showing the event details, competition rules, etc.
2. Team Registration functionality:
team name, player's names and ages;
contact information;
payment;
lunch pack requirements (includes any special dietary needs);
car parking requirements.
3. Social media promoting the event and its aims.
4. Applications (apps) to promote healthy lifestyles including fitness and healthy eating apps.
5. Health Park:
An online knowledge base about healthy lifestyles that includes a discussion forum.
The Website Team have a lot of experience in IT and have been using agile for several years. They are delivering the website through five two-week timeboxes. The team uses a Scrum Master to facilitate and the Scrum process and coach people accordingly.
The Website Team are very good at Scrum. They have created a set of tasks to assess more difficult work and they refer to this as sprint zero.
Using the Project Scenario and Website Additional information, answer the following question:
The following assessment was made initially during the 'starting up a project' process:
'The Website Team is already using Scrum and it is expected that this team will be familiar with agile techniques. However, the Staff Training Team is less familiar with the agile ways of working.' Training on agile techniques was given to the Staff Training Team as a result of this assessment.
As part of the 'closing a project" process, the following observation was made:
'The Staff Training Team gained more understanding of what to fix and what to flex as the project moved into Stage 3.' Why should this observation appear in the end project report?
- A. The end project report should sum up the results of each timebox and stage.
- B. The end project report should hand over the remaining Could Haves to operational staff.
- C. The end project report should review how much scope was delivered by the project.
- D. The end project report should review the use of the Agilometer and the agile ways of working.
Answer: D
Explanation:
This observation highlights the Staff Training Team's improved understanding of agile methodologies as the project progressed, which is relevant to evaluating the effectiveness of the training provided and how well the team adapted to agile practices. Including this in the end project report emphasizes the project's contribution to developing agile capabilities within the organization.
NEW QUESTION # 36
......
Test4Sure PRINCE2 PRINCE2-Agile-Practitioner desktop practice exam software is usable on Windows computers without an active internet connection. It creates the complete scenario of the PRINCE2 Agile Practitioner Project Management Exam (PRINCE2-Agile-Practitioner) real test through its multiple mock tests. Our practice software contains all the questions which you will encounter in the PRINCE2 final test.
Valid PRINCE2-Agile-Practitioner Exam Experience: https://www.test4sure.com/PRINCE2-Agile-Practitioner-pass4sure-vce.html
- Answers PRINCE2-Agile-Practitioner Free 🧉 PRINCE2-Agile-Practitioner Certification Dump 📮 Exam PRINCE2-Agile-Practitioner Exercise 👞 Easily obtain free download of ➤ PRINCE2-Agile-Practitioner ⮘ by searching on ( www.prep4away.com ) 🗯Study PRINCE2-Agile-Practitioner Reference
- Free PDF Quiz 2025 PRINCE2 Valid Valid PRINCE2-Agile-Practitioner Test Duration 🍊 Easily obtain ➠ PRINCE2-Agile-Practitioner 🠰 for free download through ⮆ www.pdfvce.com ⮄ 🧽Answers PRINCE2-Agile-Practitioner Free
- Pass Guaranteed Quiz 2025 PRINCE2 PRINCE2-Agile-Practitioner: Pass-Sure Valid PRINCE2 Agile Practitioner Project Management Exam Test Duration 📩 Copy URL “ www.lead1pass.com ” open and search for { PRINCE2-Agile-Practitioner } to download for free 🍻PRINCE2-Agile-Practitioner Exam Online
- Latest PRINCE2-Agile-Practitioner Real Test 🚤 PRINCE2-Agile-Practitioner Questions 🐂 PRINCE2-Agile-Practitioner Certification Dump 🔜 Easily obtain ➥ PRINCE2-Agile-Practitioner 🡄 for free download through “ www.pdfvce.com ” 🟠New PRINCE2-Agile-Practitioner Test Sample
- PRINCE2-Agile-Practitioner Test Papers 🆓 Latest PRINCE2-Agile-Practitioner Real Test 🆑 Study PRINCE2-Agile-Practitioner Reference 🚕 Easily obtain [ PRINCE2-Agile-Practitioner ] for free download through [ www.prep4pass.com ] 🐉Reliable PRINCE2-Agile-Practitioner Study Notes
- Latest PRINCE2-Agile-Practitioner Test Report 🌗 PRINCE2-Agile-Practitioner Reliable Exam Simulator 🧭 PRINCE2-Agile-Practitioner Latest Test Format 👞 Search on ▷ www.pdfvce.com ◁ for ✔ PRINCE2-Agile-Practitioner ️✔️ to obtain exam materials for free download 📍Latest PRINCE2-Agile-Practitioner Real Test
- PRINCE2-Agile-Practitioner Valid Test Answers 🕟 PRINCE2-Agile-Practitioner Latest Test Format 🟤 PRINCE2-Agile-Practitioner Test Papers 🐉 Copy URL ➥ www.testsimulate.com 🡄 open and search for ➽ PRINCE2-Agile-Practitioner 🢪 to download for free 🌅Answers PRINCE2-Agile-Practitioner Free
- Updated Valid PRINCE2-Agile-Practitioner Test Duration – 100% High Hit Rate Valid PRINCE2 Agile Practitioner Project Management Exam Exam Experience 🥔 Copy URL ☀ www.pdfvce.com ️☀️ open and search for [ PRINCE2-Agile-Practitioner ] to download for free ➕PRINCE2-Agile-Practitioner Questions
- PRINCE2-Agile-Practitioner Latest Study Notes 🍝 PRINCE2-Agile-Practitioner Certification Dump 🤑 Answers PRINCE2-Agile-Practitioner Free 🌮 The page for free download of 「 PRINCE2-Agile-Practitioner 」 on ⮆ www.passtestking.com ⮄ will open immediately 🎶PRINCE2-Agile-Practitioner Test Answers
- Free PDF 2025 Latest PRINCE2 PRINCE2-Agile-Practitioner: Valid PRINCE2 Agile Practitioner Project Management Exam Test Duration 🐻 Search for { PRINCE2-Agile-Practitioner } and easily obtain a free download on ➤ www.pdfvce.com ⮘ 💎PRINCE2-Agile-Practitioner Certification Dump
- 2025 PRINCE2 PRINCE2-Agile-Practitioner: High-quality Valid PRINCE2 Agile Practitioner Project Management Exam Test Duration 😛 Search for 《 PRINCE2-Agile-Practitioner 》 and download it for free immediately on ( www.torrentvalid.com ) 💁Latest PRINCE2-Agile-Practitioner Test Report
- PRINCE2-Agile-Practitioner Exam Questions
- ltcacademy.online www.yuliancaishang.com course.alefacademy.nl skill.prestasimuda.com godigiskill.in 132.148.13.112 tcbj.qupipi.com ihomebldr.com sjwebhub.online www.peiyuege.com